• Antre de vide

    Par Clea Balestra, Diana Ugnat, Lena Brucchietti, Mathilde Linder, Maude Voutat, Nicolas John, Nicolas Otti, Niels Galitch, Noe Herrli, Olivia Wechsler, Salome Stoffel, Samuel Aeschimann, Stephane, Tim Meier, Yekan Deli, Kilian Cossali, Lucien Roy, 30/05/16

    Image Wed Jun 01 2016 12:02:00 GMT+0200 (Mitteleuropäische Sommerzeit)

    Living in a window, a collective space, suspended void modelled by a sphere, illuminated as the sun passes the structure, stabilizing itself as well as spaces around it.

                                              Image Fri Jun 10 2016 19:30:32 GMT+0200 (CEST)



    Description

    Our project challenges the question how to inhabit a window. We created a common space, a spheric room inside a wooden structure. Our construction system was to develop an orthogonal densification system based on the existing 60x60 framework of the protostructure, to densify an entire zone in the protostructure and to spread laths to generate a space. A net permits to float in the spheric window, and to experience it.

    Image Wed Jun 01 2016 12:02:00 GMT+0200 (Mitteleuropäische Sommerzeit)
    Image Wed Jun 01 2016 14:00:28 GMT+0200 (Mitteleuropäische Sommerzeit)Image Wed Jun 01 2016 15:08:02 GMT+0200 (Mitteleuropäische Sommerzeit)





    Implantation

    The protosphere is situated in the upper south-western square of the protostructure from where it serves as a roof for the theatre underneath, and stabilises the terrace above.


    Image Tue May 31 2016 11:34:02 GMT+0200 (CEST)Image Tue May 31 2016 11:34:02 GMT+0200 (CEST)


    Image Tue May 31 2016 11:34:02 GMT+0200 (CEST)Image Tue May 31 2016 11:34:02 GMT+0200 (CEST)

    Image Fri Jun 10 2016 22:53:00 GMT+0200 (CEST)Image Fri Jun 10 2016 22:53:00 GMT+0200 (CEST)


    Image Wed Jun 01 2016 11:55:02 GMT+0200 (Mitteleuropäische Sommerzeit)
    Image Wed Jun 01 2016 10:55:31 GMT+0200 (Mitteleuropäische Sommerzeit) Image Wed Jun 01 2016 11:17:22 GMT+0200 (Mitteleuropäische Sommerzeit)


    Acces, Opening and Lighting

    The acces to the protosphere is generated by stairs which end in it's surrounding mass. The spheric form gets visible only when one enters the project, as it is covered by the structural mass surrounding the interior.

    The concept of living in a window, is what defined its placement and opening. By analyzing the course of the sun, the window is placed to let a maximum of sunlight in the space, while the view is filtered by the main structure.

    Image Tue May 31 2016 11:54:08 GMT+0200 (CEST)Image Tue May 31 2016 11:34:02 GMT+0200 (CEST)
    Image Tue May 31 2016 11:34:02 GMT+0200 (CEST) Image Wed Jun 01 2016 11:02:53 GMT+0200 (Mitteleuropäische Sommerzeit)Image Wed Jun 01 2016 14:50:39 GMT+0200 (Mitteleuropäische Sommerzeit)Image Wed Jun 01 2016 14:50:39 GMT+0200 (Mitteleuropäische Sommerzeit)
    Image Wed Jun 01 2016 10:45:08 GMT+0200 (Mitteleuropäische Sommerzeit) Image Wed Jun 01 2016 10:45:08 GMT+0200 (Mitteleuropäische Sommerzeit)



    Flooring and Net

    The net and the wooden floor are a solution to densify the structure. While the floor lets one walk freely around the room, the net symbolizes a less fluid space from where the theater underneath can easily be observed or the sunlight can be enjoyed. 

    Image Tue May 31 2016 11:34:02 GMT+0200 (CEST)Image Tue May 31 2016 11:34:02 GMT+0200 (CEST)


    Image Wed Jun 01 2016 11:17:22 GMT+0200 (Mitteleuropäische Sommerzeit)Image Mon May 30 2016 22:12:36 GMT+0200 (Mitteleuropäische Sommerzeit)

    Image Wed Jun 01 2016 11:13:39 GMT+0200 (Mitteleuropäische Sommerzeit)    


    Model 1:5

    Image Wed Jun 01 2016 10:30:47 GMT+0200 (Mitteleuropäische Sommerzeit) Image Wed Jun 01 2016 10:30:47 GMT+0200 (Mitteleuropäische Sommerzeit)


    Construction Details

    Image Tue May 31 2016 11:34:02 GMT+0200 (CEST)Image Tue May 31 2016 11:34:02 GMT+0200 (CEST)Image Tue May 31 2016 11:34:02 GMT+0200 (CEST)

     Image Tue May 31 2016 11:48:41 GMT+0200 (CEST)Image Wed Jun 01 2016 14:54:12 GMT+0200 (Mitteleuropäische Sommerzeit)
    Image Wed Jun 01 2016 14:14:00 GMT+0200 (Mitteleuropäische Sommerzeit) Image Wed Jun 01 2016 14:41:24 GMT+0200 (Mitteleuropäische Sommerzeit)Image Wed Jun 01 2016 14:14:00 GMT+0200 (Mitteleuropäische Sommerzeit)Image Wed Jun 01 2016 14:14:00 GMT+0200 (Mitteleuropäische Sommerzeit)






    Final


    Image Mon May 30 2016 15:50:14 GMT+0200 (Mitteleuropäische Sommerzeit)Image Wed Jun 01 2016 12:10:06 GMT+0200 (Mitteleuropäische Sommerzeit)



    Image Thu Jun 09 2016 20:45:10 GMT+0200 (CEST)Image Thu Jun 09 2016 20:45:10 GMT+0200 (CEST)









  • Semaine Charrette: Construction

    Par Clea Balestra, Diana Ugnat, Kilian Cossali, Lena Brucchietti, Lucien Roy, Mathilde Linder, Maude Voutat, Nicolas John, Nicolas Otti, Niels Galitch, Noe Herrli, Olivia Wechsler, Salome Stoffel, Samuel Aeschimann, Stephane, Tim Meier, Yekan Deli, 30/05/16


    Planning



    Image Wed Jun 08 2016 12:13:04 GMT+0200 (Paris, Madrid (heure d’été))





    Image Tue May 31 2016 11:10:04 GMT+0200 (CEST)Image Tue May 31 2016 11:10:04 GMT+0200 (CEST)Image Tue May 31 2016 11:10:04 GMT+0200 (CEST)Image Tue May 31 2016 11:10:04 GMT+0200 (CEST)Image Tue May 31 2016 11:10:04 GMT+0200 (CEST)Image Tue May 31 2016 11:10:04 GMT+0200 (CEST)Image Tue May 31 2016 11:10:04 GMT+0200 (CEST)Image Tue May 31 2016 11:10:04 GMT+0200 (CEST)Image Tue May 31 2016 11:10:04 GMT+0200 (CEST)


    Image Tue May 31 2016 11:19:41 GMT+0200 (CEST)Image Tue May 31 2016 11:19:41 GMT+0200 (CEST)Image Tue May 31 2016 11:19:41 GMT+0200 (CEST)Image Tue May 31 2016 11:19:41 GMT+0200 (CEST)Image Tue May 31 2016 11:19:41 GMT+0200 (CEST)Image Tue May 31 2016 11:19:41 GMT+0200 (CEST)Image Tue May 31 2016 11:19:41 GMT+0200 (CEST)Image Tue May 31 2016 11:19:41 GMT+0200 (CEST)


    Assembling at the construction site:


    Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit) Image Tue May 31 2016 10:25:38 GMT+0200 (Mitteleuropäische Sommerzeit)Image Tue May 31 2016 10:25:38 GMT+0200 (Mitteleuropäische Sommerzeit) Image Tue May 31 2016 10:25:38 GMT+0200 (Mitteleuropäische Sommerzeit)

     Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit) Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit) Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit)



    Working on the top of the protostructure:



    Image Tue May 31 2016 12:00:42 GMT+0200 (Mitteleuropäische Sommerzeit) Image Tue May 31 2016 12:00:42 GMT+0200 (Mitteleuropäische Sommerzeit)

    Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit) Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit) Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit) Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit)Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit) Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit)Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit) Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit)Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit) Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit)Image Mon May 30 2016 15:53:31 GMT+0200 (Mitteleuropäische Sommerzeit)



  • Production of 1:1

    Par Clea Balestra, Diana Ugnat, Kilian Cossali, Lena Brucchietti, Lucien Roy, Mathilde Linder, Maude Voutat, Nicolas John, Nicolas Otti, Niels Galitch, Noe Herrli, Olivia Wechsler, Salome Stoffel, Samuel Aeschimann, Stephane, Tim Meier, Yekan Deli, 22/05/16

    Flooring's production: 


    Image Sun May 22 2016 18:22:32 GMT+0200 (ora solare Europa occidentale)

    Image Sun May 22 2016 18:22:32 GMT+0200 (ora solare Europa occidentale)

    Image Sun May 22 2016 18:22:32 GMT+0200 (ora solare Europa occidentale)



    Net and tie's production:


    Image Sun May 22 2016 18:22:32 GMT+0200 (ora solare Europa occidentale)

    Image Sun May 22 2016 18:22:32 GMT+0200 (ora solare Europa occidentale)

    Image Sun May 22 2016 18:22:32 GMT+0200 (ora solare Europa occidentale)



  • LAUSANNE AND PARIS

    Par Mathilde Linder, Catia Da Cunha Pedro, Stephane, 12/10/15


    I. MOULDS

    We used our drawings to create cardboard moulds of the elements that we wanted to highlight. After 2 unsuccessful trials, we were able to obtain 2 plaster facades of Lausanne and Paris.


                                      Paris

                                      Image Sat Oct 17 2015 23:59:12 GMT+0200 (CEST)    

                                                 Image Sat Oct 17 2015 23:59:12 GMT+0200 (CEST)  

               

                                                 Lausanne

                                                 Image Sat Oct 17 2015 23:59:12 GMT+0200 (CEST)



    II. PERSPECTIVE

    We then used our drawings and plaster to draw 2 perspectives, one put the viewer in Petit-Chêne looking at Lausanne building, the other showed the vire of the Parisian building seen from Lausanne.

                                          Image Sat Oct 17 2015 23:59:12 GMT+0200 (CEST)                                                                  

                                              Image Sat Oct 17 2015 23:59:12 GMT+0200 (CEST)




















                                                

                                              

                                                

                                       

                                           




                                               







  • Lausanne's project

    Par Mathilde Linder, Catia Da Cunha Pedro, Stephane, 28/09/15


    I. THE PROJECT'S DESCRIPTION

    The project aims to depict through drawing and moulding a Lausanne building from Petit-Chêne street (and to mirror it with its own reflection in the Parisian street Rue du Mail).


                                                       Image Sun Oct 18 2015 00:40:19 GMT+0200 (CEST)


    II. MEASURES

    We used a ''Baton de Gerbert''. This basic instrument allowed us to calculate the height of our building. When the eye is aligned with the horizontal branch of the device and the vertical one and the top of the building , then the height of the building is given by the distance between the building and the stick , plus the height of the stick. 

                                                             Image Mon Sep 28 2015 08:32:46 GMT+0200 (CEST)                                                                                                                


    III. MOULD AND DRAWINGS

    The collected data allowed us to estimate the facade's dimension and then to draw our project (with an proportional approach).      

                                        Image Sun Oct 18 2015 00:40:19 GMT+0200 (CEST)

                                        Image Sun Oct 18 2015 00:40:19 GMT+0200 (CEST)