• WEEK 3 - House II

    Par Medic Marina, Terrien Romane, Belaich Yonah, Hassan Moallin Madina, Jaton Doriand Andrzej, Karameta Lundrim, Lombardi Alexandre Tristan Bénédict, Michel Kyra Lea, Ogbonna Gabriel Ihechimnemerem, Ramseyer Roman, Tiezzi Alessandro, Zbinden Arnaud Loick, 27/04/17
    First maquette

    1:10




                                   Image Fri Apr 28 2017 16:52:05 GMT+0200 (CEST)



            Image Fri Apr 28 2017 16:52:05 GMT+0200 (CEST)    Image Fri Apr 28 2017 16:52:05 GMT+0200 (CEST) 
     
            Image Fri Apr 28 2017 16:52:05 GMT+0200 (CEST)    Image Fri Apr 28 2017 16:52:05 GMT+0200 (CEST)



                                           Image Fri Apr 28 2017 16:52:05 GMT+0200 (CEST)



    Prefabrication

    Pieces in the container / Categorisation 


          Image Fri Apr 28 2017 16:52:05 GMT+0200 (CEST)Image Fri Apr 28 2017 16:52:05 GMT+0200 (CEST)  


          Image Fri Apr 28 2017 16:52:05 GMT+0200 (CEST)  Image Fri Apr 28 2017 16:52:05 GMT+0200 (CEST)


  • WEEK 2 - House II

    Par Medic Marina, Belaich Yonah, Hassan Moallin Madina, Jaton Doriand Andrzej, Karameta Lundrim, Lombardi Alexandre Tristan Bénédict, Michel Kyra Lea, Ogbonna Gabriel Ihechimnemerem, Ramseyer Roman, Terrien Romane, Tiezzi Alessandro, Zbinden Arnaud Loick, 09/04/17
    Maquette 1:10
    DETAIL



              Image Mon Apr 10 2017 01:31:43 GMT+0200 (CEST)              Image Mon Apr 10 2017 01:31:43 GMT+0200 (CEST)



              Image Mon Apr 10 2017 08:21:26 GMT+0200 (CEST)      Image Mon Apr 10 2017 08:56:52 GMT+0200 (CEST)




    Maquette 1:5
    Detail



             Image Mon Apr 10 2017 01:31:43 GMT+0200 (CEST)                        Image Mon Apr 10 2017 08:21:26 GMT+0200 (CEST)


             Image Mon Apr 10 2017 08:21:26 GMT+0200 (CEST)     Image Mon Apr 10 2017 08:56:52 GMT+0200 (CEST)



    Planning of week 2


                         Image Mon Apr 10 2017 09:11:14 GMT+0200 (CEST)


    3D modelling



                       Image Mon Apr 10 2017 10:44:47 GMT+0200 (CEST)




    Drawings


                                                   Image Mon Apr 10 2017 08:21:26 GMT+0200 (CEST)   

                                                                                                                                section (1:20)

                        Image Mon Apr 10 2017 09:42:15 GMT+0200 (CEST)             Image Mon Apr 10 2017 09:53:57 GMT+0200 (CEST)
      


                        Image Mon Apr 10 2017 09:56:31 GMT+0200 (CEST)      Image Mon Apr 10 2017 09:59:25 GMT+0200 (CEST)





          Image Mon Apr 10 2017 09:59:25 GMT+0200 (CEST)




    Transport
    details
    Image Mon Apr 10 2017 01:59:46 GMT+0200 (CEST)


    Structure DETAILS 1:1
    Final approach


    the flying floor

    We used straps to connect the timbers between them. The straps are useful for the transport (we just have to roll up and put them in the container) and for Zürich to put them on the structure. 


    Image Sun Apr 09 2017 21:30:37 GMT+0200 (CEST)   

    Image Sun Apr 09 2017 21:30:37 GMT+0200 (CEST)


    Image Sun Apr 09 2017 21:30:37 GMT+0200 (CEST)


    Image Sun Apr 09 2017 21:30:37 GMT+0200 (CEST)



                                                          Image Mon Apr 10 2017 01:15:43 GMT+0200 (CEST)                                       

                                                                                                                                         wound timbers


    the node 

    constituted by 4 vertical and 3 horizontal wooden timbers (section 2X5)


                        


                        Image Sun Apr 09 2017 20:48:38 GMT+0200 (CEST)Image Sun Apr 09 2017 20:48:38 GMT+0200 (CEST)



    Structure DETAILS 1:1
    First approach


    the node

                        Image Mon Apr 10 2017 09:11:14 GMT+0200 (CEST)       Image Mon Apr 10 2017 09:11:14 GMT+0200 (CEST)                                                                                                                                                                                                        axonometry (1:2)


                                                     Image Sun Apr 09 2017 20:41:10 GMT+0200 (CEST)                                                                                                                                                         the floor (1:20)


         Image Sun Apr 09 2017 20:41:10 GMT+0200 (CEST)       Image Sun Apr 09 2017 20:41:10 GMT+0200 (CEST)

                                                                                the structure (1:1)                                                   the node (1:1)




                              Image Mon Apr 10 2017 10:44:47 GMT+0200 (CEST)



    Reference: Iris Andraschek, Hubert Lobnig - "Life between buildings - Lebensbaum und Kalaschnikow" (2005) Donau-Universität Krems



                                                  Image Mon Apr 10 2017 10:49:53 GMT+0200 (CEST)


    Reference: Claude Parent, Vivre à l'oblique. croquis (1965)



  • WEEK 1 - House II

    Par Belaich Yonah, Hassan Moallin Madina, Jaton Doriand Andrzej, Karameta Lundrim, Lombardi Alexandre Tristan Bénédict, Medic Marina, Michel Kyra Lea, Ogbonna Gabriel Ihechimnemerem, Ramseyer Roman, Terrien Romane, Tiezzi Alessandro, Zbinden Arnaud Loick, 02/04/17

    The nodes

    Three type of nodes for the structure of the main slope


                                                   1st node


    Image Sun Apr 02 2017 15:01:51 GMT+0200 (CEST) 


    This node is the one asking for the lowest quantity of

    wood (contrary of the two others) but the ramp is

    supported on the edge line (of the prominent wood) and not

    on the flat part of the bar sections. There's, there for, a gap

    between the two wooden timbers.




                                                    2nd node

    Image Sun Apr 02 2017 15:01:51 GMT+0200 (CEST)


    Because of the gap's problem, we added a second

    vertical placed in a staggered pattern to better support the bar

    used for the slope.




                                                                                       3rd node


                                                         Image Mon Apr 03 2017 10:04:47 GMT+0200 (CEST)


  • ROOMS - FINAL WEEK - Dionysos's playground

    Par Ogbonna Gabriel Ihechimnemerem, Terrien Romane, 22/03/17


                                                Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)


    The play of platform transports you in a fluide way through the whole project. The stage is placed in a way that the spectator has to cross it, what blurs the physical barriers and thus the role of the spectator. The unic program space is transformed in a bifonctional space by putting other platforms on the back part of the protostructure. Trying to activate the all the space given by the protostrucure.


                  Processus


                                Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)      Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)

                                                       During the processus of construction, model 1:10



     Global view



     Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)      Image Mon Mar 27 2017 20:37:45 GMT+0200 (Europe de l’Ouest (heure d’été))

                                                                                                                                                    

      Section of the global project with the relation of human body, drawing 1:20




               


                The surrounding platforms are densifying the cubic space of the central space.


                       Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)




    Details of construction



               


    Image Mon Mar 27 2017 20:37:45 GMT+0200 (Europe de l’Ouest (heure d’été))      Image Mon Mar 27 2017 20:37:45 GMT+0200 (Europe de l’Ouest (heure d’été))

    Intersection between the structure and the plateform model 1:10                                                   prefabrication detail

     





                            Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)

                        Details of the primary structure vertical, model 1:10 




                                Situation


                                                       Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest) 

                                                      passage between the two space orchestred by the protostructure, model 1:10.




                                     Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)

                                                                      view on the different level of plateform, model 1:10

                                                                                               



    Research Drawings



              Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)       Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)

                 section research, 1:20                                                                      plan research, 1:20

                                              



    Final Drawings



    Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)     Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)     Image Wed Mar 22 2017 12:27:26 GMT+0100 (Europe de l’Ouest)

    Final plan, drawing 1:20                                        Elevation of the public-space, drawing 1:20           Elevation of the stage space, drawing 1:20


                                                     

  • ROOMS - WEEK 3 - EVOLVING PLAYGROUNG

    Par Ogbonna Gabriel Ihechimnemerem, Terrien Romane, 16/03/17


                                                                         ROOMS_JC_romaneterrien-ogbonnagabriel_301 

                                                                      Hong Kong architects Olivier Ottevaere and John Lin

                                                       


    We worked more on the gride provides by the module that guides our project. Bringing down the scene and repetating it to creat a roof. We transformed the platfrom of the initial scene in a circulation space.



              global views

    ROOMS_JC_romaneterrien-ogbonnagabriel_118 
    ROOMS_JC_romaneterrien-ogbonnagabriel_119 ROOMS_JC_romaneterrien-ogbonnagabriel_117

                                                the structure with and without platform. model 1:10

               


                          nodes


                          ROOMS_JC_romaneterrien-ogbonnagabriel_120  ROOMS_JC_romaneterrien-ogbonnagabriel_121  ROOMS_JC_romaneterrien-ogbonnagabriel_122

                               stairs connection. model 1:10              roof platform support. model 1:10        scene support. model 1:10

                            



                        situation views                   


                              ROOMS_JC_romaneterrien-ogbonnagabriel_123 

                               relation scene-performer. model 1:10

               


                                                                               ROOMS_JC_romaneterrien-ogbonnagabriel_124

                                                                                                relation stairs-man. model 1:10    



                          ROOMS_JC_romaneterrien-ogbonnagabriel_125

                               view from the stairs. model 1:10




    We worked a lot with the drawings to try to find the right scales and heights of the platforms




                     ROOMS_JC_romaneterrien-ogbonnagabriel_203      ROOMS_JC_romaneterrien-ogbonnagabriel_204

                         working plan. drawings 1:20                                                 working section. drawing 1:20 





                     ROOMS_JC_romaneterrien-ogbonnagabriel_205      ROOMS_JC_romaneterrien-ogbonnagabriel_206

                           final section. drawing 1:20                                                 final plan 1:20