• MURMURE.

    Par Raphaël Staubli, 28/05/19



        CONSTRUCTION.

    Last minutes modification with the ingenieur and the protostructure made that the project became 2meter smaller than planned. Having a repetitive structure for our walls, the modification has been easily managed in the construction site. The project has been mounted inside the protostructure in four days.


    Evian-les-Bains_Site la Grange-au-Lac

         Image Mon May 27 2019 23:45:06 GMT+0200 (heure d’été d’Europe centrale)       Image Mon May 27 2019 23:45:06 GMT+0200 (heure d’été d’Europe centrale)


    Image Mon May 27 2019 23:45:06 GMT+0200 (heure d’été d’Europe centrale)       Image Mon May 27 2019 23:45:06 GMT+0200 (heure d’été d’Europe centrale)

      
          Image Mon May 27 2019 23:45:06 GMT+0200 (heure d’été d’Europe centrale)       Image Mon May 27 2019 23:45:06 GMT+0200 (heure d’été d’Europe centrale) 




  • EVOLVING.

    Par Raphaël Staubli, 19/05/19


        DRAWING.

    The verticality, fragile and thin, emerging in the protostructure, need to be strengthened with some diagonal. This primordial issue needs to make the project stable without altering the project. This require discussions with the ingenieur and research in drawing.


    Plan and transversal sections (1:20)

    Image Sun May 19 2019 21:36:21 GMT+0200 (heure d’été d’Europe centrale)



        PREFABRICATION.

    In parallel, structural elements, roof, and diagonals are getting prefabricated at the EPFL. A planning for the five days on the construction site is also done, revealing the real challenge oncoming.


    Image Sun May 19 2019 21:36:21 GMT+0200 (heure d’été d’Europe centrale)






  • Construction process...

    Par Audrey Wurges, Charles Darrousez, Elisa Nadas, Ella Bacchetta, Eric Gozzi, Gabrielle Chilinski, Hugo Cabaret, Hugo Lavorel, Jérôme Margueron, Léo Ornstein, Malak Abdelhady, Philippe Jenny, Raphaël Staubli, Stephen Bopeso, Victor Duchastel De Montrouge, 19/04/19

  • WALL 1.

    Par Elisa Nadas, Malak Abdelhady, Philippe Jenny, Raphaël Staubli, 19/04/19


        DRAWING.

    Using the defined structural element, the wall 1. is created. The drawing shows that some element needs to be cut, or reduced to fit the opening for example. Therefore a notation system is introduced to clearly identify each element in the wall. They are named by letter horizontaly, and by number verticaly. By adding the wall number before, each structural element of the project has his own designation (for example, 1A3 in the wall 1.). Plan and elevations make the coordination between other walls, and allows us to understand the floor and bracing possibilities.


    Plan and elevations (1:20)

    Image Fri Apr 19 2019 10:36:59 GMT+0200 (heure d’été d’Europe centrale)





        MAQUETTE & 3D MODELLING.

    In parallel of the drawing, the maquette and the 3D modelling are done, giving additional informations like building order, building difficulties or even global visual aspect.


    Image Fri Apr 19 2019 10:36:59 GMT+0200 (heure d’été d’Europe centrale)     Image Fri Apr 19 2019 10:36:59 GMT+0200 (heure d’été d’Europe centrale)



    Image Fri Apr 19 2019 10:36:59 GMT+0200 (heure d’été d’Europe centrale)





  • STRUCTURAL ELEMENT.

    Par Jérôme Margueron, Raphaël Staubli, 14/04/19


        RESEARCH & DRAWING.

    Having five days to build the project in Evian implies a lot of prefabrication and standardisation. A structural element is dimensioned to solve most issues (repeating in the protostructure, hold the load, easily carried, ...). Some axonometric tests are drawn to understand the link between the structural element and the protostructure.


    Elevations (1:50) and sketches

    Image Sun Apr 14 2019 00:02:26 GMT+0200 (heure d’été d’Europe centrale)  Image Sun Apr 14 2019 00:48:49 GMT+0200 (heure d’été d’Europe centrale)