• EVOLVING.

    Par Raphaël Staubli, 19/05/19


        DRAWING.

    The verticality, fragile and thin, emerging in the protostructure, need to be strengthened with some diagonal. This primordial issue needs to make the project stable without altering the project. This require discussions with the ingenieur and research in drawing.


    Plan and transversal sections (1:20)

    Image Sun May 19 2019 21:36:21 GMT+0200 (heure d’été d’Europe centrale)



        PREFABRICATION.

    In parallel, structural elements, roof, and diagonals are getting prefabricated at the EPFL. A planning for the five days on the construction site is also done, revealing the real challenge oncoming.


    Image Sun May 19 2019 21:36:21 GMT+0200 (heure d’été d’Europe centrale)






  • Prefabrication

    Par Hugo Cabaret, Audrey Wurges, Charles Darrousez, Elisa Nadas, Ella Bacchetta, Eric Gozzi, Gabrielle Chilinski, Hugo Lavorel, Jérôme Margueron, Léo Ornstein, Malak Abdelhady, Philippe Jenny, Raphaël Staubli, Stephen Bopeso, Victor Duchastel De Montrouge, 17/05/19

    The last week before going in Evian, which is the fifth week for the House phase, we all worked on doing the prefabrication. We started by going couple times at the cutting site, we used the measures of our drawings and of our Rhino files.

    We then made some templates to assemble our frames with a right angle and with the correct distance. 

    We then all screwed our frames. All our frames are built in a way that every horizontals sits on the horizontals of the proto, and that it won't be too heavy to lift it up.

    houses_tc_cabarethugo_106

    (Having some fun making the template with Leo)

    houses_tc_cabarethugo_107

     (Screwing our double width joist)

    houses_tc_cabarethugo_108

    (placing our frames in the template with Charles and Philippe)

  • Construction process...

    Par Audrey Wurges, Charles Darrousez, Elisa Nadas, Ella Bacchetta, Eric Gozzi, Gabrielle Chilinski, Hugo Cabaret, Hugo Lavorel, Jérôme Margueron, Léo Ornstein, Malak Abdelhady, Philippe Jenny, Raphaël Staubli, Stephen Bopeso, Victor Duchastel De Montrouge, 19/04/19

  • WALL 1.

    Par Elisa Nadas, Malak Abdelhady, Philippe Jenny, Raphaël Staubli, 19/04/19


        DRAWING.

    Using the defined structural element, the wall 1. is created. The drawing shows that some element needs to be cut, or reduced to fit the opening for example. Therefore a notation system is introduced to clearly identify each element in the wall. They are named by letter horizontaly, and by number verticaly. By adding the wall number before, each structural element of the project has his own designation (for example, 1A3 in the wall 1.). Plan and elevations make the coordination between other walls, and allows us to understand the floor and bracing possibilities.


    Plan and elevations (1:20)

    Image Fri Apr 19 2019 10:36:59 GMT+0200 (heure d’été d’Europe centrale)





        MAQUETTE & 3D MODELLING.

    In parallel of the drawing, the maquette and the 3D modelling are done, giving additional informations like building order, building difficulties or even global visual aspect.


    Image Fri Apr 19 2019 10:36:59 GMT+0200 (heure d’été d’Europe centrale)     Image Fri Apr 19 2019 10:36:59 GMT+0200 (heure d’été d’Europe centrale)



    Image Fri Apr 19 2019 10:36:59 GMT+0200 (heure d’été d’Europe centrale)





  • Stratégie constructive

    Par Elisa Nadas, Jérôme Margueron, Raphaël Staubli, 18/04/19

    Pendant qu'un groupe se concentrait sur les problèmes de dimensionnements du projet, un autre travaillait sur le développement de modules constructifs pour la préfabrication des murs et des planchers.


    Tests de modules en maquette:

    Image Thu Apr 18 2019 16:31:18 GMT+0200 (heure d’été d’Europe centrale)         Image Thu Apr 18 2019 16:31:18 GMT+0200 (heure d’été d’Europe centrale)


    Image Thu Apr 18 2019 16:59:39 GMT+0200 (heure d’été d’Europe centrale)         Image Thu Apr 18 2019 16:59:39 GMT+0200 (heure d’été d’Europe centrale)

                                                                                                                             Structures murs (modules)


    Image Thu Apr 18 2019 16:59:39 GMT+0200 (heure d’été d’Europe centrale)             Image Thu Apr 18 2019 17:20:10 GMT+0200 (heure d’été d’Europe centrale)

                                                                                                                   Structure porteuse sol      Image Tue Apr 30 2019 14:11:56 GMT+0200 (heure d’été d’Europe centrale)

                                                        axonométrie structure porteuse du sol en appui sur un module du mur