• HOUSES ERGONOMY - DEBATE ROOM (brouillon)

    Par Cruchaud Nina, Melgar Luis, Suter Delphine Magaline, 31/05/20








    also with: Stephen Bopeso from studio Bondu and Filali Aymane from the articulation group from studio Treiber.

    Ergonomy 


    Study on how design can influence the interaction between body and architecture. It can apply on different scales from the hand touch to the feeling of the whole body being in a room.


    This approach is directly linked to the experiences and flows chapters in term of conceptualization of the space. Regarding the construction part, the collaboration with articulations and details groups allowed us to deliver a precise project.


    We cared about creating a space that can be experienced in the most natural way. However in some specific situations, working with the opposite logic in mind, can create a voluntary contradiction in the idea to unsettle the protagonist.


    Indeed this unusual experience can call out to him and bring him a new sensation.




    After separating into different chapters we then created new groups to focus our efforts on some specific parts of the house collaborating with the articulation group. 


    The debate room evolved in many ways regarding ergonomic, material, or structural questions.

    Image Sun May 31 2020 15:04:09 GMT+0200 (CEST)

     A part of the chapter "ergonomy and articulation" of the REAL BOOK is dedicated to this section of the house. Here are few pages of it. 


    Image Sun May 31 2020 19:59:06 GMT+0200 (CEST)Image Sun May 31 2020 19:59:06 GMT+0200 (CEST)Image Sun May 31 2020 19:59:06 GMT+0200 (CEST)

    Image Sun May 31 2020 20:30:18 GMT+0200 (CEST)Image Sun May 31 2020 20:30:18 GMT+0200 (CEST) 

    The design was made in a way to appeal the five senses.

    For example the sails can induce various consequences regarding lights but also the touch of the fabric or even movements and unbalanced feelings that can be caused by the sitting of someone on the other side of the bleacher. 

    Image Sun May 31 2020 19:59:06 GMT+0200 (CEST)


    Ergonomic researches are expressed through sketches of the interaction between the body and the space around at different scales. 

    Image Sun May 31 2020 19:59:06 GMT+0200 (CEST)Image Sun May 31 2020 19:59:06 GMT+0200 (CEST)Image Sun May 31 2020 19:59:06 GMT+0200 (CEST)Image Sun May 31 2020 19:59:06 GMT+0200 (CEST)

    Some collages were also produced to express the atmosphere that can be felt regarding the sails in therm of shadows during debates or just with natural and calm shadows of the trees.




    Image Sun May 31 2020 19:59:06 GMT+0200 (CEST)Image Sun May 31 2020 19:59:06 GMT+0200 (CEST)

  • HOUSES_SYNTHSESIS CHAPTER 9

    Par Cudré-Mauroux Sacha, Stanislas Nicolas, Waeber Marek, 31/05/20


    Elia Bianchi(A), Julie Favre(B), Léna Villetelle(B), Marek Waeber(W), Nicolas Stanislas(W), Sacha Cudré-Mauroux(W)



    Here is the synthesis of our final work with the pages of the book for our chapter 9: Material Pragmatism.

    Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)



    The Catalog : some prefabricated elements


    Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)

    Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)



    Transportation


    Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)


    The eight days of assembly


    Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)

    Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)



    Sourcing synthesis : Prices, Weights, Materials, Sourcing per part of the house


    Image Sun May 31 2020 11:27:23 GMT+0200 (heure d’été d’Europe centrale)
  • A JUNCTURE MATERIAL PRAGMATISM (GR9) STORY BOARD 2

    Par Cudré-Mauroux Sacha, Waeber Marek, Stanislas Nicolas, 30/05/20

    Second story board 


    Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)


    Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)


    Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)


    Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)


    Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)


    Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)Image Sat May 30 2020 18:28:03 GMT+0200 (heure d’été d’Europe centrale)





  • A JUNCTURE MATERIAL PRAGMATISM (GR9) STORY BOARD

    Par Cudré-Mauroux Sacha, Waeber Marek, Stanislas Nicolas, 30/05/20

    Story Board

    Image Sat May 30 2020 18:07:34 GMT+0200 (heure d’été d’Europe centrale)

    the site



    Image Sat May 30 2020 18:07:34 GMT+0200 (heure d’été d’Europe centrale)

    material depots




    Image Sat May 30 2020 18:07:34 GMT+0200 (heure d’été d’Europe centrale)

    Soil measurement to determine the position of the protostructure



    Image Sat May 30 2020 18:07:34 GMT+0200 (heure d’été d’Europe centrale)

    Installation of templates



    Image Sat May 30 2020 18:07:34 GMT+0200 (heure d’été d’Europe centrale)

    Assembling of modules with braces



    Image Sat May 30 2020 18:07:34 GMT+0200 (heure d’été d’Europe centrale)

    installation of part of the protostructure



    Image Sat May 30 2020 18:07:34 GMT+0200 (heure d’été d’Europe centrale)

    Installation of the protostructure



    Image Sat May 30 2020 18:07:34 GMT+0200 (heure d’été d’Europe centrale)Image Sat May 30 2020 18:07:34 GMT+0200 (heure d’été d’Europe centrale)Image Sat May 30 2020 18:07:34 GMT+0200 (heure d’été d’Europe centrale)


    Story board behind the scenes


    Image Sat May 30 2020 19:08:30 GMT+0200 (heure d’été d’Europe centrale)




  • A JUNCTURE MATERIAL PRAGMATISM (GR9) LOGISTIQUE CYCLE

    Par Cudré-Mauroux Sacha, Waeber Marek, Stanislas Nicolas, 30/05/20

    Logistique cycle


    Before building the House, we have to look for the materials that we will use during the construction. It's about finding local businesses that provide the materials we need without being too expensive. This step also establishes a first budget for the House.


    Image Sat May 30 2020 15:42:33 GMT+0200 (heure d’été d’Europe centrale)





    The prefabrication step is an big step in the process of building the House. most parts of the House are prefabricated (In EPFL) in order to reduce construction time on site.

    Image Sat May 30 2020 15:42:33 GMT+0200 (heure d’été d’Europe centrale)
    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)



    Map of prefabrication places in EPFL




    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)

    First identification of prefabrications parts




    Image Sat May 30 2020 15:57:18 GMT+0200 (heure d’été d’Europe centrale)


    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)

    the different prefabricated parts are identified


    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)


    mounting locations






    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)



    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)
    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)

    Volumetric axonometric of the truck with the prefabricated pieces






    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)
    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)
    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)







    Image Sat May 30 2020 15:51:45 GMT+0200 (heure d’été d’Europe centrale)




    The materials of the House are mostly reused in the following years but the storage capacity is limited. We looked for other storage solutions.


    Image Sat May 30 2020 15:57:18 GMT+0200 (heure d’été d’Europe centrale)


    Recycling locations map



    Image Sat May 30 2020 15:57:18 GMT+0200 (heure d’été d’Europe centrale)