• ROOMS_BEGINNINGS

    Par Nguyen Guillaume, 28/02/20

    WEEK 1: RESEARCH THROUGH THE LINES 

    FIND A WAY WITH FOUR PLANS (3m x 3m) TO GENERATE A SPACE WITHIN THE PROTOSTRUCTURE



                        perspective drawing + research through sketches and mockups

    ***


    during the first week of the ROOMS phase, our main focus was to conceive an interior space with an certain entrance condition.

    in order to do so, we mainly used the drawings as a starting point to imagine the space and start thinking how one's body would interact within these space

        FIRST ITERATION: my focal point for my space was the environment around it more specifically the Rhône. so using this                                     narrative as a starting point i developed a space which purpose is to sit and gaze at the water


    plans + elevation 1:10

    Image Sun Mar 01 2020 23:29:08 GMT+0100 (heure normale d’Europe centrale)


    elevation + section 1:10


    Image Sun Mar 01 2020 23:35:25 GMT+0100 (heure normale d’Europe centrale)


    axon 1:10


    Image Sun Mar 01 2020 23:35:25 GMT+0100 (heure normale d’Europe centrale)















  • Rooms_Drawings of the first idea

    Par Hennel Claire, 28/02/20

    DRAWINGS

    Elevation

    ROOMS_UW_hennel-claire_104


    Perspective of the entrance, as a human inside who's looking outside 

    ROOMS_UW_hennel-claire_102ROOMS_UW_hennel-claire_103

    Axon

    ROOMS_UW_hennel-claire_101




  • ROOMS

    Par Suter Delphine Magaline, 26/02/20

    WEEK 1 : BEGINNING

    Image Wed Feb 26 2020 09:39:20 GMT+0100 (heure normale d’Europe centrale)


    CREATING A SPACE WITH FOUR PLANS, USING THE HEIGHT OF THE PROTOSTRUCTURE TO CREATE A SENSATION OF INTERIORITY.

    LOOKING FOR A WAY TO AVOID INTERSECTIONS WHICH ISOLATE THE PROTAGONIST FROM THE BEAUTIFUL ENVIRONMENT HE'S IN.

    STUDY OF THE EFFECTS CREATED BY THE SHADOWS OF THE PLANS AT DIFFERENT TIMES OF THE DAY.



    Image Sun Mar 01 2020 21:37:00 GMT+0100 (heure normale d’Europe centrale)Image Sun Mar 01 2020 21:37:00 GMT+0100 (heure normale d’Europe centrale)Image Sun Mar 01 2020 21:37:00 GMT+0100 (heure normale d’Europe centrale)Image Mon Mar 09 2020 14:05:29 GMT+0100 (heure normale d’Europe centrale)

    PLAN 1/10                   ELEVATIONS 1/10          PERSPECTIVE FROM THE ENTRANCE          AXONOMETRY




    WEEK 2 : CHANGES

    FROM THE CONSTRAINT OF HAVING NO INTERSECTIONS CAME THE IDEA OF REFLEXION BETWEEN THE DIFFERENT PLANS

    INSTEAD OF LIGHT AND SHADOW, THE USE OF SOUND WILL ESTABLISH AN INTERIORITY.

    FOCALISATION OF THE ROAR OF THE RHONE AND THE SWISH OF THE FOREST AROUND THE SITE.


    AS A RESULT

    CONCEPTION OF AN INTERIOR PASSABLE WITHOUT LIGHT.

    INTRODUCTION OF A MOVEMENT FROM TOP TO BOTTOM WITH THE SPACES CREATED BY FOCALISATION OF THE TWO SOURCES


    ROOM VISIBLE BY HEARING.


    Image Mon Mar 09 2020 14:05:29 GMT+0100 (heure normale d’Europe centrale)Image Mon Mar 09 2020 14:05:29 GMT+0100 (heure normale d’Europe centrale)

                          PLAN 1/10                                                 ELEVATION FROM WEST SIDE


    (SOUND REPRESENTATION WITH HATCHES)




    WEEK 3 : ESSENCE

    ALMOST BUT NOT TOUCHING

    THE IDEA OF SOUND GIVE THE OPORTUNITY TO IMAGINE A SOUND-REFLECTING ROOM.

    REPETITION OF AN ISOSCELES TRIANGLE CREATE BY THE NESTING OF THE THREE DIAGONALS PLANS.

    CONVERGENCE OF THE PLANS IN THE CENTER OF THE ROOM, 

    CONRTADICTION BETWEEN THE DENSIFICATIONS AND THE VOID CREATE BY THE HOLE IN THE CENTER OF THE HORIZONTAL PLAN.

    ENHANCEMENT OF THE PROTSTRUCTURE PASSING THROUGH THE SPACE WITHOUT TOUCHING IT.


    Image Mon Mar 09 2020 14:31:02 GMT+0100 (heure normale d’Europe centrale)

    FIRST SKETCH





    WEEK 4 : INSERTION 

    CUT OF THE HORIZONTAL PLAN.


     PRODUCTION OF A CROSS FROM THE STRUCTURE AROUND THE TRIANGLE TO DEVIATE THE PROTOSTRUCTURE.


    Image Sun Mar 15 2020 10:21:14 GMT+0100 (heure normale d’Europe centrale)

    HORIZONTAL PLAN, NESTING


    Image Sun Mar 15 2020 10:21:14 GMT+0100 (heure normale d’Europe centrale)Image Sun Mar 15 2020 10:21:14 GMT+0100 (heure normale d’Europe centrale)ASSEMBLING IN THE PROTOSTRUCTURE




    CONSTRUCTION OF THE DIAGONAL PLANS SUSPEND TO THE PROTOSTRUCTURE WITH A SYSTEM OF THREE ATTACHMENT NOD FOR EACH PLAN

    Image Sun Mar 15 2020 13:14:39 GMT+0100 (heure normale d’Europe centrale)


    Image Sun Mar 15 2020 13:14:39 GMT+0100 (heure normale d’Europe centrale)

    CONSTRUCTION'S DETAILS OF THE DIAGONALS PLANS





    WEEK 5 AND 6 : METAMORPHOSIS

    VIRTUAL CONSTRUCTION OF A DEBATE ROOM



    Image Mon Mar 30 2020 09:09:33 GMT+0200 (heure d’été d’Europe centrale)


                    PLAN AND ELEVATION                                             ROOF AND GROUND CONDITION





    Image Tue Mar 31 2020 13:45:27 GMT+0200 (heure d’été d’Europe centrale)


                 VIEW FROM THE ENTRANCE                                                 INTO THE EYES OF THE MODERATOR




    Image Mon Mar 30 2020 09:09:33 GMT+0200 (heure d’été d’Europe centrale)

                  PODIUMS CONDITION                                              AXONOMETRY AND MOCKUP OF THE

    ATTACHMENT NOD IN 1/10                    

      



    Image Mon Mar 30 2020 09:09:33 GMT+0200 (heure d’été d’Europe centrale)

    CUT OF THE PROTOSTRUCTURE AND CONSOLIDATION OF IT




  • ROOMS

    Par , 13/11/19


    Image Mon Apr 06 2020 13:54:32 GMT+0200 (Central European Summer Time)